Crushed stone calculator

Calculation of the amount of crushed stone for the foundation, paths, blind areas and bedding

5 Factions
Фракций щебня
99%
Calculation accuracy
5 Types of work
Типов работ

Crushed stone calculator

Calculation of the amount of crushed stone for the foundation, paths, blind areas and bedding

Calculation parameters

Автоматически обновляется при выборе фракции

Calculation results

Enter parameters for calculation

Crushed stone calculator online

The online crushed stone calculator will help you calculate the required amount of crushed stone for various construction works: foundations, paths, blind areas and bedding. The dimensions of the area, the thickness of the layer, the fraction and density of crushed stone, as well as the supply of material are taken into account.

The crushed stone calculator uses precise formulas to calculate the volume and weight of the material, taking into account the type of work and the characteristics of the crushed stone. Suitable for calculating various fractions: from small (5-10 mm) for decoration to large (40-70 mm) for bedding. Calculation formula: Volume = Area × Thickness or Volume (if specified directly). Weight = Volume × Density. Taking into account the stock: Final volume = Volume × (1 + Stock / 100).

Examples of crushed stone calculations

Let's look at practical examples of calculating the amount of crushed stone for various types of work:

Example 1: Foundation cushion 8x10 m

Standard cushion for strip foundation, crushed stone fraction 20-40 mm

Входные данные:

Length: 8 m, Width: 10 m, Thickness: 0.2 m Fraction: 20-40 mm Density: 1400 kg/m³ Stock: 10%

Расчёт:

Area: 8 × 10 = 80 m² Volume: 80 × 0.2 = 16 m³ Weight: 16 × 1400 = 22,400 kg With reserve: 16 × 1.1 = 17.6 m³ Weight with reserve: 17.6 × 1400 = 24.640 kg

Результат:

Required: 17.6 m³ (24,640 kg) crushed stone

Тип:

Pillow under the foundation

For the foundation, a fraction of 20-40 mm is recommended for better compaction

Example 2: Garden path 15x1 m

Garden path made of crushed stone, fraction 10-20 mm

Входные данные:

Length: 15 m, Width: 1 m, Thickness: 0.1 m Fraction: 10-20 mm Density: 1450 kg/m³ Stock: 15%

Расчёт:

Area: 15 × 1 = 15 m² Volume: 15 × 0.1 = 1.5 m³ Weight: 1.5 × 1450 = 2.175 kg With a margin: 1.5 × 1.15 = 1.725 m³ Weight with reserve: 1.725 × 1450 = 2.501 kg

Результат:

Required: 1.725 m³ (2.501 kg) crushed stone

Тип:

garden path

For paths, a finer grain size is recommended for ease of walking.

Example 3: Blind area around the house

Blind area 1 m wide around the house 10×12 m, crushed stone 20-40 mm

Входные данные:

Perimeter: 44 m, Width: 1 m, Thickness: 0.15 m Fraction: 20-40 mm Density: 1400 kg/m³ Stock: 10%

Расчёт:

Area: 44 × 1 = 44 m² Volume: 44 × 0.15 = 6.6 m³ Weight: 6.6 × 1400 = 9,240 kg With reserve: 6.6 × 1.1 = 7.26 m³ Weight with reserve: 7.26 × 1400 = 10.164 kg

Результат:

Required: 7.26 m³ (10.164 kg) crushed stone

Тип:

Blind area

The blind area protects the foundation from water; the correct thickness is important

Example 4: Backfill for tiles 20×15 m

Leveling bedding for paving slabs, coarse fraction

Входные данные:

Area: 300 m², Thickness: 0.08 m Fraction: 20-40 mm Density: 1400 kg/m³ Stock: 5%

Расчёт:

Volume: 300 × 0.08 = 24 m³ Weight: 24 × 1400 = 33,600 kg With reserve: 24 × 1.05 = 25.2 m³ Weight with reserve: 25.2 × 1400 = 35.280 kg

Результат:

Required: 25.2 m³ (35,280 kg) crushed stone

Тип:

Backfill under tiles

For backfilling under tiles, uniform layer thickness is important.

Example 5: Decorative path with small crushed stone

Decorative path made of fine crushed stone 5-10 mm

Входные данные:

Length: 10 m, Width: 0.8 m, Thickness: 0.05 m Fraction: 5-10 mm Density: 1500 kg/m³ Stock: 20%

Расчёт:

Area: 10 × 0.8 = 8 m² Volume: 8 × 0.05 = 0.4 m³ Weight: 0.4 × 1500 = 600 kg With a margin: 0.4 × 1.2 = 0.48 m³ Weight with reserve: 0.48 × 1500 = 720 kg

Результат:

Required: 0.48 m³ (720 kg) crushed stone

Тип:

Decorative path

Small crushed stone is used for decorative purposes

Example 6: Large area of ​​bedding

Leveling a large area, volume 50 m³

Входные данные:

Volume: 50 m³ Fraction: 40-70 mm Density: 1350 kg/m³ Stock: 10%

Расчёт:

Weight: 50 × 1350 = 67,500 kg With reserve: 50 × 1.1 = 55 m³ Weight with reserve: 55 × 1350 = 74.250 kg

Результат:

Required: 55 m³ (74.250 kg) crushed stone

Тип:

Site filling

For large volumes, it is more profitable to order crushed stone in tons with delivery

How is the amount of crushed stone calculated?

Calculating the amount of crushed stone includes several stages to obtain an accurate result, taking into account all work parameters and material characteristics.

Формулы расчёта:

  • Area = Length × Width
  • Volume = Area × Thickness or Volume (if specified directly)
  • Weight = Volume × Density
  • Volume with reserve = Volume × (1 + Reserve / 100)

Типы работ с щебнем

Различные виды строительных работ с использованием щебня:

Фундамент

Толщина: 0.15-0.2 м

Подушка под фундамент

Дорожка

Толщина: 0.1-0.15 м

Садовая дорожка из щебня

Отмостка

Толщина: 0.1-0.2 м

Защита фундамента от воды

Подсыпка

Толщина: 0.05-0.1 м

Выравнивание и подсыпка

Фракции щебня и их применение

Различные фракции щебня и их плотность:

5-10 мм

1500 кг/м³

Декоративные дорожки

10-20 мм

1450 кг/м³

Фундамент, дорожки

20-40 мм

1400 кг/м³

Подушка, отмостка

40-70 мм

1350 кг/м³

Подсыпка, дренаж

Calculation of crushed stone volume

Calculation of crushed stone volume

Расчёт объёма щебня по площади и толщине слоя или напрямую по объёму

Calculation of crushed stone weight

Расчёт веса щебня с учётом фракции и плотности материала

Selection of crushed stone fraction

Выбор фракции щебня с автоматическим определением плотности

Material stock accounting

Учёт запаса материала для компенсации усадки при трамбовке

High calculation accuracy

Высокая точность расчётов на основе строительных стандартов

Advantages of the crushed stone calculator

Using a crushed stone calculator provides many advantages when planning construction work: accurate calculation of the amount of material, cost savings, correct choice of fraction, waste minimization.

Accurate calculation of the amount of crushed stone

Точный расчёт количества щебня с учётом всех параметров работ

Saving on purchasing extra material

Экономия на покупке лишнего материала, оптимизация затрат

Proper procurement planning

Правильное планирование закупок и доставки материала

Convenient and fast payment

Удобный и быстрый расчёт без необходимости сложных вычислений

Tips for calculating crushed stone

To get an accurate result, follow our recommendations when calculating crushed stone.

Измерения

Carefully measure all dimensions of the area

Фракция

Choose the right fraction for the type of work

Запас

Always add a margin of 10-15%

Трамбовка

Consider shrinkage when tamping

Frequently asked questions about calculating crushed stone

How to calculate the amount of crushed stone for the foundation?

For a pillow under the foundation, calculate the area of ​​the foundation and multiply by the thickness of the layer (usually 0.15-0.2 m). Example: foundation 8x10 m, thickness 0.2 m → area 80 m², volume 16 m³. With a margin of 10%: 17.6 m³ of crushed stone.

What fraction of crushed stone is needed for the foundation?

For the foundation cushion, crushed stone of a fraction of 20-40 mm is usually used. This fraction compacts well and provides a reliable base. For concrete in the foundation, a fraction of 5-20 mm or 20-40 mm is used.

How much crushed stone is needed for a path?

For a garden path, calculate the area (length × width) and multiply by the layer thickness (usually 0.1-0.15 m). Example: track 15×1 m, thickness 0.1 m → area 15 m², volume 1.5 m³. With a margin of 15%: 1.725 m³ of crushed stone.

What crushed stone density is used for calculations?

The density of crushed stone depends on the fraction and rock: granite crushed stone 5-10 mm - 1500 kg/m³, 10-20 mm - 1450 kg/m³, 20-40 mm - 1400 kg/m³, 40-70 mm - 1350 kg/m³. Limestone crushed stone is usually 100-200 kg/m³ lighter.

How to calculate the volume of crushed stone for a blind area?

The blind area is calculated around the perimeter of the house. Example: house 10×12 m, perimeter 44 m, width of the blind area 1 m, thickness 0.15 m → area 44 m², volume 6.6 m³. With a margin of 10%: 7.26 m³ of crushed stone.

Do I need a supply of crushed stone when purchasing?

Yes, always add a reserve of 10-15% crushed stone. The reserve takes into account shrinkage during compaction, unevenness of the site and possible losses during transportation and installation.

How to convert the weight of crushed stone into volume?

Volume = Weight / Density. For example, 14,000 kg of crushed stone with a density of 1,400 kg/m³ = 14,000 / 1,400 = 10 m³. For reverse calculation: Weight = Volume × Density.

Is it possible to use different fractions of crushed stone?

Yes, different fractions are used for different jobs: 5-10 mm - decorative paths, 10-20 mm - standard paths and foundation, 20-40 mm - foundation cushion and blind area, 40-70 mm - backfill and leveling.

How to calculate the amount of crushed stone for backfilling under tiles?

To backfill under paving slabs, calculate the area and multiply by the thickness of the layer (usually 0.05-0.1 m). Example: area 300 m², thickness 0.08 m → volume 24 m³. With a margin of 5%: 25.2 m³ of crushed stone.

How much does 1 m³ of crushed stone weigh?

The weight of 1 m³ of crushed stone depends on the fraction and rock: granite 5-10 mm - 1500 kg, 10-20 mm - 1450 kg, 20-40 mm - 1400 kg, 40-70 mm - 1350 kg. Limestone crushed stone is usually 100-200 kg lighter than granite.

How to calculate crushed stone for a large area?

For a large area, measure the area or enter the volume directly. If the area is large, divide it into sections and calculate separately. Don't forget to add a margin of 10-15% for shrinkage.

Is it possible to mix different fractions of crushed stone?

Yes, sometimes different fractions are mixed for better compaction. For example, for a foundation cushion they can use a mixture of 20-40 mm and 40-70 mm in a 70/30 ratio. The calculator allows you to specify the average density of the mixture.

How to take into account the shrinkage of crushed stone when compacting?

Shrinkage of crushed stone during compaction is usually 10-15%. This is taken into account in the material stock. If the reserve is not specified separately, it is recommended to add 10-15% to the calculated volume.

What is the thickness of the crushed stone layer for the foundation?

The thickness of the foundation cushion is usually 0.15-0.2 m for a strip foundation and 0.2-0.3 m for a slab foundation. For concrete preparation under the foundation, the layer of crushed stone can be 0.1-0.15 m.

How to calculate the perimeter for a blind area?

Perimeter of the house for the blind area = 2 × (Length + Width). Example: house 10 × 12 m → perimeter = 2 × (10 + 12) = 44 m. Blind area = Perimeter × Blind area width.

How much crushed stone is needed per 1 m² of path?

Depends on the thickness of the layer. With a thickness of 0.1 m: 1 m² × 0.1 m = 0.1 m³. With a density of 1450 kg/m³, this is 145 kg of crushed stone. With a thickness of 0.15 m: 0.15 m³ or 217.5 kg per 1 m².

How to choose a fraction of crushed stone for a path?

For garden paths, a fraction of 10-20 mm or 20-40 mm is recommended. The fine fraction is more comfortable for walking, the coarse fraction allows water to pass through better. For decorative paths you can use 5-10 mm.

How to calculate crushed stone for leveling a site?

To level, measure the area of ​​the site and the average depth of holes or differences in height. Volume = Area × Average thickness. Add a margin of 10-15% for shrinkage during compaction.

Is it possible to use sand instead of crushed stone for a pillow?

It is recommended to use crushed stone for the foundation cushion, as it drains water better and does not shrink. Sand can be used as an additional layer on top of crushed stone.

How to calculate the cost of crushed stone?

Cost = Volume × Price per m³ or Weight × Price per ton. Example: 17.6 m³ of crushed stone for 1500 ₽/m³ = 26,400 ₽. Or 24,640 kg (24.64 t) at 2000 ₽/t = 49,280 ₽.

What is the difference between crushed stone and gravel?

Crushed stone is obtained by crushing rocks; it has sharp edges. Gravel is a natural material with rounded grains. Crushed stone is usually used for construction, and gravel for decoration. Density and calculation are similar.

How to transport crushed stone?

Crushed stone is transported by dump trucks, measuring volume in m³ or weight in tons. A standard dump truck transports 10-20 m³ of crushed stone. When ordering, please indicate the volume or weight for the correct selection of transport.

Is it necessary to compact crushed stone when laying it?

Yes, crushed stone must be compacted (tamped) after laying. When compacting, shrinkage occurs by 10-15%, which must be taken into account when calculating. The compaction ensures the strength and stability of the base.

How to calculate crushed stone for drainage?

For drainage, large crushed stone of a fraction of 20-40 mm or 40-70 mm is used. Calculate the volume of the trench: length × width × depth. Example: trench 50×0.5×0.5 m = 12.5 m³. With a margin of 10%: 13.75 m³.

Is it possible to use recycled crushed stone?

Recycled crushed stone (from crushed concrete) can be used for bedding and paths, but not for a foundation cushion. The density of secondary crushed stone is slightly lower, about 1200-1300 kg/m³.

How to calculate crushed stone for parking?

For parking, calculate the area and multiply by the thickness of the layer (usually 0.2-0.25 m). Example: parking 20×10 m, thickness 0.2 m → area 200 m², volume 40 m³. With a margin of 10%: 44 m³ of crushed stone.

What is the thickness of the crushed stone blind area?

The thickness of a crushed stone blind area is usually 0.1-0.2 m. For reliable protection of the foundation, a thickness of 0.15-0.2 m is recommended. The width of the blind area should be at least 0.6-0.8 m.

How to take into account the slope angle when calculating?

For sloped areas, calculate the average layer thickness. If the slope is significant, divide the site into parts and calculate each separately. The slope of the blind area is usually 2-5% of the foundation.

How much crushed stone do you need to put under a fence?

To backfill under a fence, calculate the length of the fence, the width of the backfill and the thickness of the layer. Example: fence 50 m, bedding width 0.5 m, thickness 0.1 m → area 25 m², volume 2.5 m³. With a margin of 10%: 2.75 m³.

How to calculate crushed stone for concrete?

For concrete, crushed stone is included in the mixture. Typically the proportion is 1:3:5 (cement:sand:crushed stone). To calculate crushed stone in concrete, use a concrete calculator, which takes into account all components of the mixture.